Discussion Starter · #1 · (Edited)
Hooked up the air supply knife valve and temporarily attached the fan to bring in fresh air to the shelter project. Some rebar added, need 'a lot' more before lowering the door frame down. I managed to separate the bunker door from its frame, found that the hinges actually have roller bearings on them for ease of opening. Separating the two makes it a lot lighter to handle, I believe together it weighs about 600 lbs, the front and rear door panels are 3/8" steel, and that's before I pour lightweight concrete in the door core after its totally installed. The white 4" pipe is "t" for the sewer hookup to the pump-up toilet.
 

·
YourAdministrator, eh?
Joined
·
8,000 Posts
Looks like things are coming along nicely! If I didn't know better, I would say that you were a miner in an earlier life :beercheer:
 

·
Premium Member
Joined
·
1,733 Posts
Discussion Starter · #5 ·
That looks great. Are the walls hard rock?
They are decomposed granite, not quite as hard as rock but almost. Need jackhammer to work, too old to use pick and shovel anymore. Then into a 5 gallon bucket. One good thing is that I can use the loose sieved DG instead of sand in the concrete mix, its called 'sharp sand'. An engineer in Japan has studied it and found in some cases to be superior because of its shape, rough rather than smooth as in the case of river sand.
 

·
Registered
Joined
·
155 Posts
I wish we had that here. All we have is clay and a high water table. I did notice in other posts that your working under a slab. Did you pour the slab or was old work. The reason I ask is concern for cave in.
 

·
Premium Member
Joined
·
1,733 Posts
Discussion Starter · #7 ·
I poured the steel reinforced slab when I built the work shop about a year or so ago. I have supports under to hold it up until I start pouring walls. Will have a rebar reinforced concrete 1ft round column in the middle to help. The plan is to break holes in the existing slab and pump concrete in to build roof support after I get the 1ft thick walls up. Right now its about 10' x 10' x 7'. Should have had this poured when I originally built the workshop, oh well!:scratch
 

·
Premium Member
Joined
·
1,733 Posts
Discussion Starter · #9 · (Edited)
Looks like it is coming along great. What is your overall goal? What systems do you hope to have fully installed when done?
I know there are other threads under construction that covers this, but here it goes.

The first room which is almost excavated is going to be 10' x 10' x 8' high, contain most of the air systems, toilet, and air lock entrance door. I've installed the outside 4" air intake pipe made of steel sched 40 galv. about 5ft above the ground with a brass wool filter and cover. It goes down to a "t" which which has a 12" nipple on the bottom that will act as a particle trap, then the 90 goes to a 4" steel knife valve. This in turn will feed into a bio filter, a merv 13 particle and carbon filter and a UV light. This is similar to the one I presently have for the house, not quite as powerful, less CFM. Then to a 4" ABS pipe sweep that will contain the CO2 scrubber, the in-line fan and on to the large hand cranked blower.

This system can be sealed from the outside via the knife valve, and the inside air can be cycled thru the Sofnolime and carbon scrubber filter either by the in-line AC fan or the hand blower. I also have (2) 300cf 3000psi air cylinders to provide positive pressure for about 18 hrs @ 14psi., and a small O2 bottle to replenish the oxygen while using the scrubber.

http://www.preparedsociety.com/forum/f38/co-2-scrubber-2109/

I have the (4) t-105 batteries and the 4000w inverter ready to be installed as soon as I'm ready, the system will receive 24VDC from the house system to keep the batteries charged. I can turn the genset on/off from a remote switch on the inverter from inside the shelter. These will be in a sealed room that can be vented to the outside to remove any hydrogen produced during battery charging, either from the house or the genset.

bunkerbob

The toilet is a manual flush up design that will receive water from my outside tanks and send waste to my septic system.

Twist 'n' Lock Manual Toilets

The inner door is from a bunker set up during the late 60s, very heavy, 4" thick, and will be mounted in a 1' thick wall, then filled with lightweight concrete. An entrance will be a 4' x4' room outside the door, with a shower system, deterrent devices and a sump pump to carry off waste water. I built a similar system at my last underground shelter.

I've researched the LED grow-light systems for interior plant growing, Naekid had some great ideas using fiber-optics to bring in natural light, still looking into that, the growing of plants will help reduce stress if we have to stay for extended period of time. One wall will have a large mural of a outside forest scene theme to also help, looked into this when we contemplated building a underground/earth sheltered home.

Some google images

Cooking will be done on a butane fired stove that uses cartridges, and has the least amount of pollution, it will be placed under or near the exhaust pipe similar to the intake one, which will also have a knife valve that can be sealed. Water will be gravity piped in from my 5000gal tanks from above ground to 55 gallon barrels, thus having a reserve supply if above ground tanks are disabled.

We have an abundant supply of long-term stored food and goods, these will be in-place as soon as I am done.

I have an extra CCTV system that is also ready to install, one wireless the other hardwired, both have external mics. Ham radio gear will be installed also for communication.

Believe it or not I have about 90% of the equipment all ready to install.
Well you got me started....:2thumb:
 

·
Registered
Joined
·
348 Posts
It all sounds great. And that blast door looks like an awesome find.

What are your plans for overhead lighting? Bulbs? Flourescents? LEDs?
 

·
Premium Member
Joined
·
1,733 Posts
Discussion Starter · #11 ·

·
Registered
Joined
·
348 Posts
They sound fantastic. I think I might order some and give them a shot for a project I'm working on. How well do they light up, compared to something like a standard lightbulb?
 

·
Premium Member
Joined
·
1,733 Posts
Discussion Starter · #13 · (Edited)
They sound fantastic. I think I might order some and give them a shot for a project I'm working on. How well do they light up, compared to something like a standard lightbulb?
Its hard to compare these with standard bulbs, they are more directional. Used in work area type lighting situations is best, instead of wasting light on unused areas. The 110vac type I use in the house are more comparable to 'standard' bulbs, not as directional. These are coming into their own now that demand is increasing and R & D progresses.
 

·
Administrator
Joined
·
2,248 Posts
I tried to find abandoned civil defense stuctures in Texas specifically the Austin San MArcos area and couldn't find any. Bunker Bob can you help?
 

·
Registered
Joined
·
155 Posts

·
Premium Member
Joined
·
1,733 Posts
Discussion Starter · #17 · (Edited)
I tried to find abandoned civil defense stuctures in Texas specifically the Austin San MArcos area and couldn't find any. Bunker Bob can you help?
Let me check some sources I have, they explore old mines and underground sites, haven't used them for a while though. Years ago thats how I found the underground city site near Blyth, CA. the source of the bunker door I have. :sssh: These sites are 'open' somewhat to exploration and this one is still partially full of civil defense supplies, crackers and water.:2thumb:

Edit: Here is a document I found a long while ago and is still on the net, this should make you tingle...http://www.dtic.mil/cgi-bin/GetTRDoc?AD=AD617111&Location=U2&doc=GetTRDoc.pdf
and this...hobo_template
and more...Mine Utilization in Crises - Planning Manual. - Storming Media
and I'm not sure how far away this is...http://coldwar-c4i.net/DentonTX/May1961.pdf
even more...US Underground Bases
research this...http://dept.ca.uky.edu/asmr/W/Full Papers 1997/20.PDF
That should get you started, that's how I found most of my sites.:2thumb:
 

·
Junior Member
Joined
·
71 Posts
That is a fantastic setup. I would like to be able to do something like that myself someday. Time, money, and the wife will probably put an end to those dreams.
 

·
Premium Member
Joined
·
1,733 Posts
Discussion Starter · #19 ·
That is a fantastic setup. I would like to be able to do something like that myself someday. Time, money, and the wife will probably put an end to those dreams.
Try putting more time and money in your wife, she may come along faster. I know mine just gave in years ago, one reason maybe is that we have been married for over 32 years.:2thumb::2thumb::2thumb:
 

·
wanna be prepared
Joined
·
71 Posts
bunkerbob, awesome work! you are great inspiration!
and listen to bob,,,if you want your wife to approve put more time and money into HER first ,haha:2thumb:
I dont know that i will ever be as prepared as you people but i really want to be!!:beercheer:
 